High Point, NC - Oak Hollow Pump Station Generator Addition

The project generally includes site work consisting of erosion control and grubbing; construction of concrete pads for the generator, transformers, transfer switches, and battery cabinets; installation of a pre-purchased 1250kW generator with sub-base fuel tank, transformers, and automatic transfer switches; connection to existing 4160 Vac and 480 Vac services serving the pump station, aeration building, and dam equipment; and coordination with the Owner’s Integrator for required SCADA system modifications.