High Point, NC - Oak Hollow Pump Station Generator Addition
The project generally includes site work consisting of erosion control and grubbing; construction of concrete pads for the generator, transformers, transfer switches, and battery cabinets; installation of a pre-purchased 1250kW generator with sub-base fuel tank, transformers, and automatic transfer switches; connection to existing 4160 Vac and 480 Vac services serving the pump station, aeration building, and dam equipment; and coordination with the Owner’s Integrator for required SCADA system modifications.
You need to register or login to view files and more project information.
Bid Set
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Plans | 13.8 MB | ||
| Specs | 49.9 MB | ||
| Watermarked Plans | 12.9 MB | ||
| Watermarked Specs | 47.7 MB |
