High Point, NC - Oak Hollow Pump Station Generator Addition
The project generally includes site work consisting of erosion control and grubbing; construction of concrete pads for the generator, transformers, transfer switches, and battery cabinets; installation of a pre-purchased 1250kW generator with sub-base fuel tank, transformers, and automatic transfer switches; connection to existing 4160 Vac and 480 Vac services serving the pump station, aeration building, and dam equipment; and coordination with the Owner’s Integrator for required SCADA system modifications.
You need to register or login to view files and more project information.
Status
Accepting Bids
| Prebid Date | 12/3/25 2:00pm |
| Bid Date | 12/17/25 2:00pm |
Company & Contacts
City of High Point
Greg Parret
Location
High Point, NC
For information regarding this project please contact:
Greg Parret (336-883-4795)
City of High Point NC
816 E Green Drive, High Point NC 27260
