High Point, NC - Oak Hollow Pump Station Generator Addition

The project generally includes site work consisting of erosion control and grubbing; construction of concrete pads for the generator, transformers, transfer switches, and battery cabinets; installation of a pre-purchased 1250kW generator with sub-base fuel tank, transformers, and automatic transfer switches; connection to existing 4160 Vac and 480 Vac services serving the pump station, aeration building, and dam equipment; and coordination with the Owner’s Integrator for required SCADA system modifications.
You need to register or login to view files and more project information.

Status

Accepting Bids

Prebid Date 12/3/25 2:00pm
Bid Date 12/17/25 2:00pm

Company & Contacts

City of High Point
Greg Parret  

Location

High Point, NC

For information regarding this project please contact:

Greg Parret (336-883-4795)

City of High Point NC

816 E Green Drive, High Point NC 27260

greg.parret@highpointnc.gov