North Topsail Beach, NC - Flooding Improvements (20240793.00.WK)

Construction of proposed infiltration system at the northern end of Gray Street, which will reduce flooding on NC-210-Island Drive. In addition, construction of a proposed level spreader with vegetated filter strip, and permeable pavers at the North Topsail Beach Town Park along New River Inlet Road. These systems will reduce flooding on New River Inlet Road.
You need to register or login to view files and more project information.

Status

Accepting Bids

Prebid Date 2/24/26 10:00am
Bid Date 3/10/26 10:00am

Company & Contacts

WK Dickson & Co LLC An Ardurra Company
Kristel Weldon  

Location

North Topsail Beach, NC

For information about the meaning or content of the bid documents please contact:

Michael Tassitino

Mtassitino@ardurra.com

WK Dickson & Co LLC, An Ardurra Company

Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis as indicated in the Bid Form. The Owner reserves the right to reject any and all bids.

The Project has an expected duration of: 150 days to Substantial Completion and 180 days to Final Completion.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.