High Point, NC - West Green Drive Green Stormwater Infrastructure Project

Provide all labor, materials, equipment, and incidentals to complete roadway, drainage, and stormwater improvements in accordance with the 2024 NCDOT Standard Specifications, Roadway Standard Drawings, and project special provisions. Work includes grading, erosion control, vegetation establishment, installation of SCM cleanouts, check dams, impermeable liners, and drainage structures; concrete and asphalt paving; curb, gutter, and stamped concrete; and foundations for metal poles. All work shall meet City of High Point requirements, BABA provisions, and applicable federal, state, and local regulations, with final acceptance based on specified quality and performance standards.
You need to register or login to view files and more project information.
Bid Set (click to expand/collapse)
Name Size
Plans 38.5 MB
Specs 6.7 MB
Watermarked Plans 30.7 MB
Watermarked Specs 6.7 MB