Asheville, NC - Taxiway A Rehabilitation Phase 1
This project consists of a Base Bid and optional Bid Alternate (to be awarded at the discretion of the Owner). The Base Bid includes asphalt pavement milling, asphalt pavement crack seal, isolated full depth asphalt pavement removal, airfield asphalt paving, isolated airfield asphalt full depth pavement construction, airfield electrical (lighting and signage), minor grading and drainage improvements, erosion and sediment control, and airfield markings. The Bid Alternate includes marking removal, asphalt pavement crack seal, asphalt seal coat application, and airfield markings. Reference is directed to the plans and specifications for phasing details and airfield project requirements.
You need to register or login to view files and more project information.
Plan Holders
| Date | Company | Contact |
| 11/11/25 8:45 am |
APAC Asheville
1188 Smoky Park Highway
Candler, NC 28715 |
Eddie Davies
Project Manager
Tel: 8652167045
|
| 11/12/25 4:34 pm |
ConstructConstruct
3825 Edwards Road
Suite 800 CINCINNATI, OH 45209 |
Construct Connect
Tel: 18003642059
|
| 11/11/25 12:23 pm |
Kwest Group, LLC
8305 Fremont Pike
Perrysburg, OH 43551 |
Nick Young
Tel: 419-874-4284
|
| 11/11/25 10:18 am |
RG Tenney Electric, Inc
1213 Nathan Blvd
Suite A Loganville, GA 30052 |
Ryan Tenney
President
Tel: 7703789255
|
