Stanley, NC - Brevard Pump Station Basin Sanitary Sewer Rehabilitation Phase II
The proposed Work is generally described as follows: 1. Installation of approximately 3,100 LF of 8-inch PVC and DIP gravity sewer; 2. Installation and reconnection of 37 sanitary sewer laterals; 3. Installation of a duplex submersible pump station and approximately 460 LF of 4-inch PVC force main; 4. Abandonment of an existing pump station and force main; and 5. Surface restoration of disturbed areas
You need to register or login to view files and more project information.
Bid Set
(click to expand/collapse)

Name | Size | ||
2000075293-Plans signed_20250819 | 127.5 MB | ||
2000075293-Project Manual_20250819 | 63.6 MB |