Greensboro, NC A&T - High-Tech Greenhouse

This project includes an approximate 1,323 gross square feet greenhouse with an integrated headhouse at the north end. The headhouse portion is included in this narrative as it is envisioned to be greenhouse construction with solid, insulated metal panels in lieu of glazing material. The greenhouse is based on a European Venlo roof design. The greenhouse will include a 3-foot-high concrete/masonry knee-wall around its perimeter. The greenhouse is subdivided into separate interior compartments to accommodate researcher and department needs. The compartments include the following sizes and quantities: 1. 156 square feet (14.5 square meters), "Innovation” “Engineering” (200 sf nominal) compartment (qty 2) 2. 159 square feet (14.8 square meters), "SFLS” “Environmental Studies” (200 sf nominal) compartment (qty 2) Compartments are located on a common access corridor along the broad length of the greenhouse, connecting to the headhouse at the north. The greenhouse compartments will be evaporative cooled and fin tube heated with a hot water boiler located in the Headhouse area.
You need to register or login to view files and more project information.

Status

Accepting Bids

Prebid Date 7/17/25 3:00pm
Bid Date 7/31/25 3:00pm

Company & Contacts

MRA Architecture & Design
Mitchell Ramseur  

Location

Greensboro, NC

All questions, requests for clarification, and/or proposed substitutions shall be submitted via email to the architect by clicking HERE

The last date for questions, requests for clarification, and/or proposed substitutions from bidders is July 24th, 2025 at 3pm EST.

The state reserves the unqualified right to reject any and all proposals.

NOTE: The bidder shall include with the bid proposal the form Identification of Minority Business Participation identifying the minority business participation it will use on the project and shall include either Affidavit A or Affidavit B as applicable. Forms and instructions are included within the Proposal Form in the bid documents. Failure to complete these forms is grounds for rejection of the bid. (GS143-128.2c Effective 1/1/2002.) SCO-Notice To Bidders 2010 - (Updated Dec. 2010)

All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades.

General contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina, will be observed in receiving and awarding general contracts. General contractors submitting bids on this project must have license classification for Building.

NOTE--SINGLE PRIME CONTRACTS: Under GS 87-1, a contractor that superintends or manages construction of any building, highway, public utility, grading, structure or improvement shall be deemed a “general contractor” and shall be so licensed. Therefore a single prime project that involves other trades will require the single prime contractor to hold a proper General Contractors license. EXCEPT: On public buildings being bid single prime, where the total value of the general construction does not exceed 25% of the total construction value, contractors under GS87- Arts 2 and 4 (Plumbing, Mechanical & Electrical) may bid and contract directly with the Owner as the SINGLE PRIME CONTRACTOR and may subcontract to other properly licensed trades. GS87-1.1- RULES .0210

Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be workretained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law.

A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price.

Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work.

No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 30 days.

The owner reserves the right to reject any or all bids and to waive informalities.