Mansfield, OH - Mansfield Lahm Regional Airport - Rehabilitate Runway 14-32 (23098)
This project consists of a mill-and-fill rehabilitation of Runway 14-32 (9,001’ x 150’), including runway overruns with a non-strengthening FAA specification P-401 bituminous asphalt overlay. The scope of the project includes the following: • 2-inch nominal bituminous pavement milling. • Fill and repair encountered pavement cracks with an engineer approved non-shrink grout-type crack filler material. • Grade correction overlay through the Runway 14-32 intersection with Runway 5-23. • Pavement fillet demolition in the intersection of Runway 14-32 and Runway 5-23. • Adjust threshold lights and MALSR threshold bar and install maintenance pads. • FAA specification P-401, 2-inch nominal overlay placed in one 2-inch lift for the entire length of the runway and overruns. • Runway grooving per FAA specification. • Runway shoulder restoration grading, seeding and mulching as required. • Application of initial and final precision instrument runway pavement markings.
You need to register or login to view files and more project information.
Status
Accepting Bids
Prebid Date | 5/12/25 12:00pm |
Bid Date | 5/21/25 10:00am |
Company & Contacts
Delta Airport Consultants
Cindy Chavez
Location
Mansfield, OH
For information regarding this project please contact:
Steve A. Potoczak
Delta Airport Consultants, Inc.
OR
Cindy Chavez
Delta Airport Consultants, Inc.
Bids must be accompanied by a certified check or a bid bond in the amount of not less than five (5) percent of the total amount bid. A Contract Performance Bond and a Contract Payment Bond each equal to 100 percent of the Contract Price will be required for the successful Contractor.
No bid may be withdrawn prior to September 18, 2025.