Spartanburg, SC - Middle Tyger Pump Station #1 Improvements (S240103)

Rehabilitation and improvements to an existing sanitary sewer pump station to include bypass pumping during construction, a new valve vault, a new submersible pump and controls, a new standby generator, crushed stone paving and chainlink fence removal and replacement.
You need to register or login to view files and more project information.

Status

Accepting Bids

Prebid Date 4/22/25 11:00am
Bid Date 5/8/25 11:00am

Company & Contacts

Spartanburg Water
Hal Morris  

Location

Spartanburg, SC

Documents

Questions should be directed to the attention of Hal Morris, hmorris@spartanburgwater.org, to receive a response, which will be distributed to all plan-holders of record, questions must be received prior to 5:00 p.m. on May 2, 2025.

A satisfactory Bid Bond provided by an acceptable surety (or the cash equivalent) in an amount equal to five percent (5%) of the total bid shall be submitted with each bid.

The District reserves the right to reject any or all bids or waive any informalities in the bidding.

Performance and payment bonds in an amount equal to one hundred percent (100%) of the contract price will be required. The bonds must be secured by cash or must be issued by a surety company licensed in the State of South Carolina with an "A" minimum rating of performance as stated in the most current publication of "Best Key Rating Guide, Property Liability."

Certificates of insurance naming the District as an additional insured and with limits as noted in the bid documents will be required.

Contractors submitting bids shall be properly licensed in the State of South Carolina to bid and perform the work on which the bid is submitted at the date of the bid.